|
DIAMOND POLY FIBRE SCREED |
TRADITIONAL SAND CEMENT |
DRYING TIMES |
30mm per week (Test show 60mm per week) |
1mm per day 50mm= 2 months before floor finishes can be laid. |
FOOT TRAFFICKING |
24 hours |
7 days, screeds should not be trafficked in this time |
INSTALLATION |
Licensed applicator, completely controlled from spec to installation. |
No control! Anyone can lay this type of screed |
GUARANTEES |
10 years Guarantee against failure including the application in accordance with BS 8204 Part 1 2003 |
No Guarantee's |
TECHNICAL BACK UP |
FREE BRE drop hammer testing FREE Carbide Moisture Testing |
No Technical back up |
STRENGTHS |
Over 40N/mm2 after 28 daysDepending on Mix Design |
Lucky to achieve 15 N/mm2 after 28 days |
SHRINKAGE |
0.40 Water/ cement ratio therefore, controlled shrinkage |
Full water content, high cement ratio means high risk of shrinkage |
MIXING |
Controlled mixing force action mixers, as per BS 8204 Part 1 |
No Control even ready mix large drum mixers. |
SPECIFICATIONS |
Full N.B.S/CSi specifications written around project guaranteed by Diamond Admixtures |
Architect/Designer responsible for writing specification |
COST m2 |
SAME PRICE AS SAND CEMENT SCREEDS |
SAME PRICE AS SAND CEMENT SCREEDS |
SYSTEMS |
Complete systems, primers, fillers, acoustic screeds, fibres etc.. |
No System, use all types of different products from different manufacturers. |